FOUNDATION AND UNDERGROUND
WORK:
·
Sub-soil
investment and soil composition will be comprehensive analyzed
by latest testing equipment
and laboratory techniques.
·
Foundation design
will be done by as per soil test report.
·
Under Ground
nearest reservoir will be designed as per with 2 days reserve.
·
Termite Ground
Water reservoir will be done by proper methods.
SUPER STRUCTURE:
·
The building will
be a Reinforced Cement Concert (RCC) frame structure.
·
Structural
designed will be done by a team of reputed structural
engineer.
·
Wind the
Earthquake effects will be consider in structural design as
per Bangladesh National Building
Code (BNBC)
·
Stone/Picked
aggregate will be used in Foundation and Column and Picked
(#1) will be used in other
structural member
SUPERVISION:
·
At least four year
experience diploma civil engineer will be appointed as full
time site engineer to
supervise the construction work.
·
In ever stage of
construction work monitored by experienced consultant of the
firm.
Features of Ground Floor:
·
A secured gateway
with decorative lamps and Brass plate logo of the Complex.
·
A spacious
entrance and driveway with security arrangement for control of
incoming and out going
persons, vehicles.
·
Society room with
toilet.
·
Grill with three
sides of complex (except road side) to protect unexpected
entry & exit.
·
PVC ceiling with
aluminum section for hiding the plumbing lines.
·
Guard room,
drivers, rest room, toilet & kitchen in gourd floor.
·
Well designed &
decorated waiting lounge near reception area of the visitors.
·
Main lobby and
reception area with impressive marble top desk.
·
Separate area on
the roof top with individual cloth’s lines for drying laundry.
·
Provisions for
Intercom system of connect each apartment & guard post to the
concierge desk.
·
One stand by
Emergency Generator for operating in case of power failure to
operate.
·
Lift.
·
The water pump.
·
Common spaces.
·
Two light & one
fans point in each flat.
KITCHEN:
·
Impressively
designed platform with Glaze tiles on top.
·
Double burner gas
outlet.
·
Good quality
FU-WANG/RAK/CBC/equivalent ceramic wall tiles (12”x12”)
·
Matching FU-WANG/RAK/CBC/equivalent
homogeneous tiles on floor (12”x12”).
·
Concealed hot and
normal water lines.
Suitable located
exhaust fan.
BATHROOM:
·
Essentially
correct uniform floor slope towards water outlet.
·
FU-WANG/CBC/RAK/equivalent
made homogeneous tiles (12”x12”) on floor.
·
FU-WANG/CBC/RAK/equivalent
ceramic tiles (8”x12”) on wall.
·
National polymer
or similar standard fittings in all bathrooms.
·
Chinese/Local
best quality sanitary fittings. Mirrors in bathrooms with
glass shelf.
·
Stainless steel
soap case and towel rail.
·
Concealed hot and
normal water lines only for master bath room.
ELECTRICAL:
·
Foreign electrical
switches, circuit breakers, plug points and other fitting (MK
Type-TCL/Siemens).
·
Light fixture in
stair and lobby (Swash/Crescent). Independent electric meter
in each apartment.
·
Electrical
distribution box with main switch.
·
Concealed
electrical wiring (BRB/Paradise/Evana/Equivalent).
·
All power outlets
with earthing connection. Provision for air conditioner in
master bed.
·
Three emergency
points in each apartment.
·
Emergency power in
lift, lobby, intercom service, common spaces like car parking,
reception area,
security room and main gate.
Concealed fan hook, cable TV outline in living room.
LIFT AND LIFT FRONT WALL:
·
International
standard imported 1 (one) Lift with 6 person’s capacity.
·
Adequate lighting.
Fast & reliable
service on all floors.
GENERATOR:
·
International
standard Generator.
·
Required KVA
capacity to cover lift, common lights and 2 lights & 1 fan
point in each Apartment.
WALLS:
·
Good quality 1st
class bricks/concrete block.
·
Smooth finish
walls.
·
Exterior wall
thickness will be 10”/5” and internal wall thickness will be
5”. (Air Condition provision in
Master Bedroom).
FLOORS:
·
Tiles (RAK/CBC/FU-WANG/Equivalent
Homogeneous 12”x12” Tiles) in the stair.
·
Tiles (RAK/CBC/FU-WANG/Equivalent
Homogeneous 12”x12” Tiles) floors tiles in lobby of all
floors.
·
All Bathrooms with
floor tiles except maid’s toilet (RAK/Equivalent)
DOORS:
·
Decorative Main
Entrance door (Chittagong teak or imported) with:
(a). Door Chain.
(b). Check Viewer.
(c). Calling bell switch of good
quality.
(d). Apartment number in
brass/crafted.
(e). Calling bell.
·
Internal doors of
strong and durable veneer flush door shutters with French
polish.
·
All internal
doorframes are made Mehagoni / Shilkorai / chapalish /
Equivalent.
·
All bathroom doors
with solid plastic.
WINDOWS:
·
Sliding windows as
per architectural design of the building.
·
5 mm thickness
glass.
·
Rainwater barrier
in 4” aluminum sections.
Safety grills in all windows.
PAINITNG AND POLISHING:
·
Exterior wall will
be weather coat.
·
Internal wall will
be plastic paint and ceilings in soft colors.
·
French polished
doorframes and shutters.
·
Car parking area
will be painted with Distemper.
·
Balcony will be
painted as per design and company standard.
·
Other Grills will
be painted with Enamel Paint as per design.
·
All kinds of
Wooden Works will be polished.
UTILITY:
·
Concealed gas and
water lines.
·
Hot and cold water
liners in master toilet and kitchen only.
·
Gas pipelines and
materials from Titas with adequate safety measures.
·
Gas and water
Meter for apt.(TITAS,WASA supplied)
Best quality water pumps with
standby facilities (Pedrollo/Sare Brand-Italy/Equivalent)
ROOF TOP:
·
Protective parapet
wall.
·
Protective Common
area.
·
Drying laundry for
the apartment owner.
·
Gardening and
sitting arrangements.
·
Roof top lime
terracing of adequate thickness by water proof Berger.
·
Roof top play
Ground for kids.
·
Community room
with toilet.
NOTE:
·
Equivalent Item(s)
will be supplied in case of non-availability or shortage of
supply of that Item(s).
·
For any kinds of
extra work (not state in the specification) requires the
approval from the company.
· The
payment of extra work must be paid in advance. If advance
payment is not made within 15 days
receiving the information, company will execute the work as
per specification.
No outside Engineer/Technicians/Workers will be
allowed to work in the project before handover the project.
END |